Support
The construction team combined with the site, deepen the design of the layout plan and structural plan for in-depth understanding, and the structural designer on-site guidance for installation. The construction team needs to understand in detail what substance is the load-bearing base of the signage before installation, and the project manager will confirm the load-bearing base with the relevant person in charge of the construction site in advance to ensure that the signage can be safe and firm after installation.