• Project
    Project
    Project

CURRENT LOCATION: Home > Project > Hotels & Resorts > JW MARRIOTT

JW MARRIOTT

Project name:JW MARRIOTT(international Five-star hotel)

Hotel area:174000 square meters

Room Number:279

Service content:deepening design,production,installation

Number of signboards:5126

The entire project cycle:9 months

Deepening the design cycle:3 months

Canopy Brand LOGO size:10867mm*980mm


Description: 

Ningxia Genyuan Marriott Hotel stands tall as a beacon of luxury and sophistication in Yinchuan City, seamlessly integrating an international brand super five-star hotel, a chic shopping center, Grade A intelligent office spaces, and opulent residential apartments. Strategically positioned at the crossroads of Ning'an Street and Beijing Road, the hotel enjoys a prestigious locale adjacent to prominent landmarks such as the Kempinski Hotel, the headquarters of Shenhua Ningmei Group, and the prestigious Bauhinia Business Center. Its proximity to the Ningxia International Convention and Exhibition Center and People's Square further underscores its significance in the cityscape.


Accommodation: 

JW MARRIOTT boasts 279 spacious and luminous guest rooms, each meticulously designed to provide unparalleled comfort and elegance to discerning travelers.


Project Execution: 

The dedicated design team at ZIGO Sign embarked on a comprehensive plan to strategically place signage throughout JW MARRIOTT. This meticulous planning phase, considering factors like power lines and architectural layout, spanned one month. Subsequently, the designers delved into the intricate details of signage and brand logos, finalizing materials and placement points over the course of two months. With approval secured from the responsible personnel at JW MARRIOTT, the production phase commenced. Over a span of four months, the skilled craftsmen at ZIGO Sign meticulously crafted 5,126 signs and the majestic Canopy Crown brand logo measuring 10,867mm x 980mm.


Installation: 

Upon arrival at the JW MARRIOTT site, the seasoned construction team from ZIGO Sign collaborated closely with the hotel management to confirm installation points and logistical requirements. This collaborative effort, spanning two months, ensured the flawless installation of all signage and tower crown brand logos as per the designated positions outlined in the approved design drawings.


JW MARRIOTT, with its exquisite design elements and meticulous attention to detail in signage, stands as a testament to luxury and refinement, offering guests an unparalleled experience of opulence and comfort.



ACTUAL EFFECT DIAGRAM



SCHEME DESIGN DRAWING



DEEPENING DESIGN DRAWING



EXTERNAL SIGNAGE ACHIEVEMENT DIAGRAM



EXTERNAL SIGNAGE ACHIEVEMENT DIAGRAM



INTERNAL SIGNAGE ACHIEVEMENT DIAGRAM